PHONE

1 604 202 4442

services

Safe, efficient and precise placement of a wide variety of materials in any location, our telebelts are ideal for almost any application.

The telebelt can save your time and costs at operative speeds of up to 4 cu.yds./min, with the ability to convey long distances in enclosed structures with our low unfolding height. Conveying with a telebelt ensures no separation, slump loss or loss of air entrainment on highly scrutinized concrete pours.

TELEBELT VERSATILITY

  • Rock placement
  • Gravel placement
  • Topsoil placement
  • Decorative rock placement
  • Porous material placement
  • Concrete placement
  • Pea gravel placement
  • Materials up-to 4inches
  • Backfilling compacted lifts
  • Slab prep
  • Spill containment systems
  • Fuel tank backfill
  • Landscaping
  • Final grading
  • Bridge decks
  • Drainage fields
  • Dams
  • Barge/river work (scour protection)
  • Fisheries
  • Swimming pool backfill and grading
  • Municipal work
  • Tree protected zones
  • Hydro substations
  • Holding ponds
  • Horse arenas
  • Water treatment centres
  • Pipeline work
  • Warehouse slabs
  • Weeping tile drainage rock installation
  • Low unfolding height
  • Final grading
  • Poured concrete foundation services
  • Septic fields/tank backfill

 

  • Rock placement
  • Gravel placement
  • Topsoil placement
  • Decorative rock placement
  • Porous material placement
  • Concrete placement
  • Pea gravel placement
  • Materials up-to 4inches
  • Backfilling compacted lifts
  • Slab prep
  • Spill containment systems
  • Fuel tank backfill
  • Landscaping
  • Final grading
  • Bridge decks
  • Drainage fields
  • Dams
  • Barge/river work (scour protection)
  • Fisheries
  • Swimming pool backfill and grading
  • Municipal work
  • Tree protected zones
  • Hydro substations
  • Holding ponds
  • Horse arenas
  • Water treatment centres
  • Pipeline work
  • Warehouse slabs
  • Weeping tile drainage rock installation
  • Low unfolding height
  • Final grading
  • Poured concrete foundation services
  • Septic fields/tank backfill

 

TELEBELT BENEFITS

  • Provides a solution to complex logistics
  • Covers long distances in enclosed structures.
  • Helps keep the job site clean with accurate material placement
  • Quick setup and teardown
  • 360 degrees of rotation of feeder boom and main placing boom
  • Little physical labour needed, increase in productivity
  • 106 feet of reach
  • High material placement with less manpower and handling machinery
  • Eliminate the need for other equipment
  • Exact material placement
  • Low clearance operations.

COMMERCIAL

residential

industrial

what our clients say